1) Unpack unit and inspect for damage
2) Refer to enclosed drawing for typical installation
3) Lower the pump and probe unit into the sump pit
4) Mount controller on wall, ensuring it will clear the elevator
as it descends to its lowest point (check with elevator contractor
to ensure proper clearance), use mounting hardware included
5) Plug controller into a separate branch circuit
6) Install clamps included as required
7) Connect the 1-1/2" discharge pipe to the building
wastewater system
8) Optional remote wiring for high oil/water alarm by electrical contractor:
Drill a 7/8" hole in the side of the controller making
sure not to damage electronics inside the box. Connect a 1/2"
liquid-tight connector to the box, liquid-tight conduit must
be used until above floor level to maintain NEMA4 rating on
the controller
NOTES:
The high oil/water remote N.O. or N.C. contacts are dry contacts.
The initial installation should be in a clean environment, clear of mud
and all metallic debris. Make sure that the intrusion of water will not directly
contact or splash the switch. Mud and other conductive materials left on the body
of the switch will hamper its operation. Clean the switch prior to leaving the
initial installation. The white plastic case may be cleaned with alcohol.
WARNING:
Installation must be in accordance with the National Electrical
Code and any other applicable state and local electrical requirements.
Do not remove ground pin. Severe shock could occur.
|